Diagnostic Test
WARNING: This page is about a different car, the 2014 RAM 1500. However, it is still accessible from the selected car via links, so may be relevant.
- ACTIVE DTC NOTE:
If DTCs P258C or P258D are present, perform the Diagnostics for those DTCs before continuing with this one.
- Ignition on, engine not running.
- With the scan tool, select View DTCs.
Is the DTC Active at this time?
Yes
- Go To 2
No
- Perform the INTERMITTENT CONDITION diagnostic procedure. Refer to INTERMITTENT DTC .
- CHECK THE FUSED RUN/START CIRCUIT
- Turn the ignition off.
- Remove the EVP Relay from the relay connector in the PDC.
- Ignition on, engine not running.
- Using a 12-volt test light connected to ground, probe the Fused RUN/START circuit (terminal 85) at the EVP Relay connector.
Does the test light illuminate brightly?
Yes
- Go To 3
No
- Replace the PDC in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to PCM VERIFICATION TEST .
- EVP RELAY
- Measure the resistance of the EVP Relay Coil.NOTE:
Measure across terminals 85 and 86 of the relay.
Is the resistance between 60 to 80 Ohms?
Yes
- Go To 4
No
- Verify that there is good pin to terminal contact in the EVP Relay and Powertrain Control Module connectors. If OK, replace the EVP Relay.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to PCM VERIFICATION TEST .
- Measure the resistance of the EVP Relay Coil.
- CHECK THE (T109) EVP SUPPLY CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- Disconnect the Electric Vacuum Pump harness connector.
- Disconnect the PDC C3 harness connector.
- Measure the resistance of the (T109) EVP Supply circuit between the Electric Vacuum Pump harness connector and the PDC C3 harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go To 5
No
- Repair the (T109) EVP Supply circuit for an open/high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to PCM VERIFICATION TEST .
- CHECK THE (T109) EVP SUPPLY CIRCUIT FOR A SHORT TO GROUND
- Measure the resistance between ground and the (T109) EVP Supply circuit at the PDC C3 harness connector.
Is the resistance above 10k Ohms?
Yes
- Go To 6
No
- Repair the (T109) EVP Supply circuit for a short to ground.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to PCM VERIFICATION TEST .
- Measure the resistance between ground and the (T109) EVP Supply circuit at the PDC C3 harness connector.
- CHECK THE EVP GROUND CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- Measure the resistance between ground and the (Z906) EVP Ground circuit at the Electric Vacuum Pump harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go To 7
No
- Repair the (Z906) EVP Ground circuit for an open/high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to PCM VERIFICATION TEST .
- Measure the resistance between ground and the (Z906) EVP Ground circuit at the Electric Vacuum Pump harness connector.
- POWER DISTRIBUTION CENTER
- Measure the resistance of the (T109) EVP Supply circuit between the EVP Relay and the PDC C3 harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go To 8
No
- Replace the Power Distribution Center in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to PCM VERIFICATION TEST .
- Measure the resistance of the (T109) EVP Supply circuit between the EVP Relay and the PDC C3 harness connector.
- POWERTRAIN CONTROL MODULE (PCM)
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Electric Vacuum Pump, PDC and the Powertrain Control Module (PCM).
- Look for any chafed, pierced, pinched or partially broken wires.
- Look for broken, bent, pushed out or corroded terminals.
- Monitor the scan tool data relative to this circuit and wiggle test the wiring and connectors.
- Look for the data to change or for the DTC to reset during the wiggle test.
- Perform any Technical Service Bulletins that may apply.
Were any problems found?
Yes
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to PCM VERIFICATION TEST .
No
- Replace the Powertrain Control Module (PCM) in accordance with the service information. Refer to MODULE, POWERTRAIN CONTROL, REMOVAL .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to PCM VERIFICATION TEST .