Right Bank
WARNING: This page is about a different car, the 2014 RAM 1500. However, it is still accessible from the selected car via links, so may be relevant.
- Clean the cylinder head, exhaust manifold and turbocharger sealing surfaces. Refer to ENGINE GASKET SURFACE PREPARATION .
- Install new exhaust manifold gaskets (2 and 4) to turbocharger (1) and the cylinder head (3).
- Install the exhaust manifold (5) and the retaining nuts (6) finger tight.
- Using the tightening sequence shown in illustration tighten nuts to:
- Tighten nuts to 15 N.m (133 in. lbs.).
- Tighten nuts to 40 N.m (30 ft. lbs.).
- Install the exhaust pressure sensor. Refer to SENSOR, EXHAUST PRESSURE, INSTALLATION .
- Connect the EGR cooler supply hose (1).
- Install bolt (1) at the rear EGR cooler bypass valve support bracket (2) and tighten to 25 N.m (18 ft. lbs.).
- Using a new O-ring seal and gasket install the EGR cooler coolant tube (2). Tighten bolts (1 and 3) to 18 N.m (159 in. lbs.).
- Install the right exhaust manifold heat shield (2). Tighten bolts (1) to 15 N.m (133 in. lbs.).
- Connect the exhaust gas temperature sensor wire harness connector (2).
- Using a new O-ring seal, install the oil dipstick tube. Tighten upper bolt to 11 N.m (97 in. lbs.).
- Raise and support the vehicle. Refer to HOISTING, STANDARD PROCEDURE .
- Install the lower oil dipstick tube bolt. Tighten bolt to 11 N.m (97 in. lbs.).
- Lower the vehicle.
- Fill the cooling system. Refer to STANDARD PROCEDURE .
- Install the engine cover (1).
- Connect the negative battery cable.
- Start the engine and check for leaks.