Manifold, Intake: Installation: Installation
WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
- Clean all gasket mating surfaces.
- Using a new gasket, install the intake manifold (2). Tighten bolts to 24 N.m (18 ft. lbs.).
- Install bolt securing the oil dip stick tube-to-intake manifold and tighten to 24 N.m (18 ft. lbs.).
- Install cylinder No. 1 fuel tube. Refer to TUBE(S), FUEL, INSTALLATION .
- Connect the EGR valve wire harness connector.
- Connect EGR air flow control valve wire harness connector (2).
- Install the Charge Air Cooler (CAC) hose (3) to the EGR air flow control valve. Tighten clamp (1) to 14 N.m (124 in. lbs.).
- Install the EGR crossover tube. Refer to TUBE, EXHAUST GAS RECIRCULATION (EGR), CROSSOVER, INSTALLATION .
- Connect both negative battery cables.