LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 351 (6.7L Engine (Service Information) - 2500 Hd & 3500 Hd) >> Manifolds >> Manifold, Intake >> Installation >> Installation

Manifold, Intake: Installation: Installation

WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: EGR Air Flow Control - Exploded View
GC0108834Courtesy of CHRYSLER GROUP, LLC
  1. Clean all gasket mating surfaces.
  2. Using a new gasket, install the intake manifold (2). Tighten bolts to 24 N.m (18 ft. lbs.).
  3. Install bolt securing the oil dip stick tube-to-intake manifold and tighten to 24 N.m (18 ft. lbs.).
  4. Install cylinder No. 1 fuel tube. Refer to TUBE(S), FUEL, INSTALLATION .
    Fig 2: Clamps, EGR Air Flow Control Valve Wire Harness Connector & CAC Hose
    GC0155380Courtesy of CHRYSLER GROUP, LLC
  5. Connect the EGR valve wire harness connector.
  6. Connect EGR air flow control valve wire harness connector (2).
  7. Install the Charge Air Cooler (CAC) hose (3) to the EGR air flow control valve. Tighten clamp (1) to 14 N.m (124 in. lbs.).
  8. Install the EGR crossover tube. Refer to TUBE, EXHAUST GAS RECIRCULATION (EGR), CROSSOVER, INSTALLATION .
  9. Connect both negative battery cables.