Diagnostic Test
WARNING: This page is about a different car, the 2013 RAM 1500. However, it is still accessible from the selected car via links, so may be relevant.
- ACTIVE DTC
- Ignition on, engine not running.
- With the scan tool, select View DTCs.
Is the DTC Active at this time?
Yes
- Go To 2
No
- Perform the INTERMITTENT CONDITION diagnostic procedure. Refer to STANDARD PROCEDURE .
- CHECK THE FUSED RUN/ START CIRCUIT
- Turn the ignition off.
- Remove the EVP Relay from the relay connector in the PDC.
- Ignition on, engine not running.
- Using a 12-volt test light connected to ground, probe the Fused RUN/START circuit (terminal 85) at the EVP Relay connector.
Does the test light illuminate brightly?
Yes
- Go To 3
No
- Replace the PDC in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- EVP RELAY
- Measure the resistance of the EVP Relay Coil.NOTE:
Measure across terminals 85 and 86 of the relay.
Is the resistance between 60 to 80 Ohms?
Yes
- Go To 4
No
- Verify that there is good pin to terminal contact in the EVP Relay and Powertrain Control Module connectors. If OK, replace the EVP Relay.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- Measure the resistance of the EVP Relay Coil.
- CHECK THE (T110) EVP RELAY CONTROL CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- Disconnect the PCM C1 harness connector.CAUTION:
Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install the GPEC Diagnostic Adaptor to perform the diagnosis.
- Connect the (special tool #10436, Adapter, GPEC Diagnostic).
- Measure the resistance of the (T110) EVP Relay Control circuit from the EVP Relay connector to the GPEC Adaptor.
Is the resistance below 5.0 Ohms?
Yes
- Go To 5
No
- Repair the (T110) EVP Relay Control circuit for an open.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- Disconnect the PCM C1 harness connector.
- CHECK THE (T110) EVP RELAY CONTROL CIRCUIT FOR A SHORT TO GROUND
- Measure the resistance between ground and the (T110) EVP Relay Control circuit at the EVP Relay connector.
Is the resistance above 10k Ohms?
Yes
- Go To 6
No
- Repair the (T110) EVP relay control circuit for a short to ground.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- Measure the resistance between ground and the (T110) EVP Relay Control circuit at the EVP Relay connector.
- POWERTRAIN CONTROL MODULE (PCM)
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Electric Vacuum Pump, PDC and the Powertrain Control Module (PCM).
- Look for any chafed, pierced, pinched or partially broken wires.
- Look for broken, bent, pushed out or corroded terminals.
- Monitor the scan tool data relative to this circuit and wiggle test the wiring and connectors.
- Look for the data to change or for the DTC to reset during the wiggle test.
- Perform any Technical Service Bulletins that may apply.
Were any problems found?
Yes
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
No
- Replace the Powertrain Control Module (PCM) in accordance with the service information. Refer to MODULE, POWERTRAIN CONTROL, REMOVAL .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .