Diagnostic Test
WARNING: This page is about a different car, the 2013 RAM 1500. However, it is still accessible from the selected car via links, so may be relevant.
- VERIFY THE DTC IS ACTIVE NOTE:
If multiple DTCs are present, inspect the wiring and harness connector at the Air Suspension Compressor.
- AIR SUSPENSION RELAY
- Turn the ignition off to the lock position.
- Install a known good relay
- Ignition on, engine not running.
- With the scan tool, erase the DTCs.
- With the scan tool, read the DTCs.
Is the status still Active for this DTC?
Yes
- Go To 3
No
- Install a new Air Suspension Relay.
- Perform the ASCM VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- (Y38) COMPRESSOR RELAY SIGNAL CIRCUIT OPEN OR HIGH RESISTANCE
Courtesy of CHRYSLER GROUP, LLC
- Turn the ignition off to the lock position.
- Remove the Air Suspension Relay.
- Disconnect the ASCM C2 harness connector.
- Measure the resistance of the (Y38) Compressor Relay Signal circuit between the ASCM C2 harness connector and the Air Suspension Relay.
Is the resistance above 5.0 Ohms?
Yes
- Repair the (Y38) Compressor Relay Signal circuit for an open or high resistance.
- Perform the ASCM VERIFICATION TEST. Refer to STANDARD PROCEDURE .
No
- Go To 4
- (Y39) AIR COMPRESSOR RELAY RETURN CIRCUIT OPEN OR HIGH RESISTANCE
Courtesy of CHRYSLER GROUP, LLC
- Measure the resistance of the (Y39) Compressor Relay Return circuit between the ASCM C2 harness connector and the Air Suspension Relay.
Is the resistance above 5.0 Ohms?
Yes
- Repair the (Y39) Compressor Relay Return circuit for an open or high resistance.
- Perform the ASCM VERIFICATION TEST. Refer to STANDARD PROCEDURE .
No
- Go To 5
- Measure the resistance of the (Y39) Compressor Relay Return circuit between the ASCM C2 harness connector and the Air Suspension Relay.
- (Y39) AIR COMPRESSOR RELAY RETURN CIRCUIT SHORTED TO GROUND
Courtesy of CHRYSLER GROUP, LLC
- Measure the resistance between ground and the (Y39) Air Compressor Relay Return circuit.
Is the resistance below 5.0 Ohms?
Yes
- Repair the (Y39) Compressor Relay Return circuit for a short to ground.
- Perform the ASCM VERIFICATION TEST. Refer to STANDARD PROCEDURE .
No
- Replace the Air Suspension Control Module (ASCM) in accordance with the Service Information. Refer to MODULE, AIR SUSPENSION CONTROL, REMOVAL .
- Perform the ASCM VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- Measure the resistance between ground and the (Y39) Air Compressor Relay Return circuit.
- INTERMITTENT WIRING AND CONNECTORS
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors.
- While monitoring the scan tool data relative to this circuit, wiggle test the wiring and connectors.
- Look for the data to change or for the DTC to reset during the wiggle test.
Were any problems found?
Yes
- Repair as necessary.
- Perform the ASCM VERIFICATION TEST. Refer to STANDARD PROCEDURE .
No
- Test complete, the condition or conditions that originally set this DTC are not present at this time.