LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 24 (Emissions Control) >> Diesel Exhaust Fluid Emissions, 6.7L Diesel >> VALVE, Diesel Exhaust Fluid Engine Coolant Control >> Installation >> Installation

VALVE, Diesel Exhaust Fluid Engine Coolant Control: Installation: Installation

WARNING: This page is about a different car, the 2011 RAM Pickup and 2011 RAM Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Removing/Installing Coolant Control Valve Assembly
GC0143731Courtesy of CHRYSLER LLC
  1. Install the coolant control valve assembly (2). Tighten bolt (1) to 54 N.m (40 ft. lbs.) .
    Fig 2: Removing/Installing Supply & Return Lines
    GC0143729Courtesy of CHRYSLER LLC
  2. Position and connect the DEF coolant lines (5) into routing clip (6).
  3. Connect the coolant supply (1) and return lines (2) to DEF tank.
    Fig 3: Removing/Installing Coolant Control Valve Harness Connector
    GC0143730Courtesy of CHRYSLER LLC
  4. Connect the coolant control valve harness connector (1).
    Fig 4: Removing/Installing Bolts
    GC0143727Courtesy of CHRYSLER LLC
  5. Install the DEF tank (2) into place. Tighten bolts (1) to 108 N.m (80 ft. lbs.).
  6. Remove the transmission jack.
    Fig 5: Removing/Installing DEF Coolant Lines, Push Pin & Coolant Lines Bracket
    GC0143723Courtesy of CHRYSLER LLC
  7. Clip coolant lines bracket (3) to frame rail and install push pin (4).
  8. Connect the coolant hoses (1 and 2) going to DEF tank.
  9. Fill the cooling system. Refer to Standard Procedure .
  10. Connect both negative battery cables.