LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1588 (Clutch System - 2500 Hd) >> Linkage >> Installation

Section 1588 (Clutch System - 2500 Hd): Linkage: Installation

WARNING: This page is about a different car, the 2017 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
GC0108058Courtesy of CHRYSLER GROUP, LLC
  1. Position cylinders and connecting line in vehicle engine compartment. Position clutch hydraulic line against the dash panel and behind all engine hoses and wiring.
  2. Apply a light coating of grease to the inside diameter of the master cylinder push rod eye.
  3. Install clutch master cylinder (1) on dash panel and tighten clutch master cylinder nuts to 28 N.m (21 ft. lbs.).
  4. Install clutch master cylinder push rod pin (3).
  5. Connect clutch pedal position interlock switch connector (2).
  6. Install plastic clip securing hydraulic line to the dash panel into the lower dash panel flange.
  7. Install plastic clip securing hydraulic line to the dash panel onto the upper dash panel stud.
  8. Raise vehicle.
    GC0108057Courtesy of CHRYSLER GROUP, LLC
    CAUTION:

    Do not allow release lever plunger to pivot more than 2° in either direction in the slave cylinder bore. Allowing the plunger to pivot more than 2° in the bore will cause fluid to bypass the seal and result in fluid leakage.

    NOTE:

    Pull the clutch release lever toward the slave cylinder opening to insure proper seating of the slave cylinder plunger to the release lever pocket.

  9. Install slave cylinder (2) and verify cylinder rod is properly seated in release lever.
  10. Install and tighten slave cylinder nuts (1) to 23 N.m (17 ft. lbs.).
  11. If new  clutch linkage is being installed, connect the clutch hydraulic line to the clutch slave cylinder.
    CAUTION:

    Once the clutch hydraulic line is connected to the slave cylinder, it should never be disconnected.

  12. Install heat shield over hydraulic line.
  13. Operate linkage several times to verify proper operation.