LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1586 (G56 Manual Transmission - (Service Information) - 2500 Hd) >> Assembly >> Front Housing

Front Housing

WARNING: This page is about a different car, the 2017 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
GC0109043Courtesy of CHRYSLER GROUP, LLC
CAUTION:

If mainshaft/bearings or countershaft/bearings are replaced, end-play measurements must taken to ensure proper bearing preload. Failure to follow these instructions will result in bearing damage.

  1. Install input shaft seal front housing bore (1) with Installer (special tool #9595, Installer, Seal) (2).
    GC0108993Courtesy of CHRYSLER GROUP, LLC
  2. Install input shaft retainer (1) and tighten bolts (2) to 23 N.m (17 ft. lbs.).
    GC0109044Courtesy of CHRYSLER GROUP, LLC
  3. Install select end play shims into the countershaft bearing cup bore.
  4. Install countershaft bearing cup with Installer (special tool #9589, Installer, Bearing Cup) (1) and Handle (special tool #C-4171, Driver Handle, Universal) (2).
    GC0109045Courtesy of CHRYSLER GROUP, LLC
  5. Install input shaft bearing oil supply washer and select end play shims into mainshaft bearing cup bore.
  6. Install mainshaft bearing cup with Installer (special tool #9588, Installer, Bearing Cup) (1) and Handle (special tool #C-4171, Driver Handle, Universal) (2).
    GC0108949Courtesy of CHRYSLER GROUP, LLC
  7. Apply Mopar™ Gasket Maker to the rear housing sealing surface.
  8. Install front housing (1) onto the rear housing (2).
  9. Install housing bolts and tighten to 58 N.m (43 ft. lbs.).
    GC0108946Courtesy of CHRYSLER GROUP, LLC
  10. Install 5-6 shift fork pin bolts (1) into housing and tighten to 58 N.m (43 ft. lbs.).
    GC0108945Courtesy of CHRYSLER GROUP, LLC
  11. Remove shift rail (2) tie strap.
    GC0109046Courtesy of CHRYSLER GROUP, LLC
  12. On a 4x2 transmission shift two shift rails to lock the transmission in two gears. Then install flange (1) on output shaft (2) and tighten bolt to 260 N.m (190 ft. lbs.). Return shift rails to neutral position.
    GC0143794Courtesy of CHRYSLER GROUP, LLC
  13. Push shift tower boot (1) onto shift tower (2).
    GC0143792Courtesy of CHRYSLER GROUP, LLC
  14. Apply Mopar™ Gasket Maker to the shift tower opening.
  15. Install shift tower (2) and tighten bolts (1) to 23 N.m (17 ft. lbs.).
    GC0108948Courtesy of CHRYSLER GROUP, LLC
  16. Install back up lamp switch (1) and bolt (2).