LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1576 (6.7L Engine (Service Information) - 2500 Hd) >> Lubrication >> Pump, Engine Oil >> Installation

Pump, Engine Oil: Installation

WARNING: This page is about a different car, the 2017 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Oil Pump Mounting Bolt Tightening Sequence
GC0108604Courtesy of CHRYSLER GROUP, LLC
  1. Lubricate the pump with clean engine oil. Filling the pump with clean engine oil during installation will help to prime the pump at engine start up.
  2. Install the pump. Verify the idler gear pin is installed in the locating bore in the cylinder block. Tighten the oil pump in three  steps, in the following sequence:
    • Step 1 Push the pump firmly against the cylinder block and install the four (4) bolts finger tight.
    • Step 2 Tighten the bolts to 8 N.m (71 in. lbs.).
    • Step 3 Tighten the bolts to 24 N.m (18 ft. lbs.).
    GC0108605Courtesy of CHRYSLER GROUP, LLC
  3. The back plate on the pump seats against the bottom of the bore in the cylinder block. When the pump is correctly installed, the flange on the pump will not touch the cylinder block.
  4. Measure the idler gear to pump drive gear backlash and the idler gear to crankshaft gear backlash. The backlash should be 0.15 - 0.25 mm (0.006 - 0.010 in.). If the backlash is out of limits, replace the oil pump.
  5. If the adjoining gear moves when you measure the backlash, the reading will be incorrect.
  6. Install the engine timing cover. Refer to COVER(S), ENGINE TIMING, INSTALLATION, 6.7L .
  7. Connect both of the battery negative cables.
  8. Start engine and check for oil leaks.