Diagnostic Test
WARNING: This page is about a different car, the 2017 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
- Active DTC
- Turn The Ignition On.
- With The Scan Tool, Record All Freeze Frame Data.
- With The Scan Tool, Erase DTCS.
- Turn The Ignition Off For 75 Seconds.
- Turn The Ignition On.
- With The Scan Tool, Read DTCS.
Did The DTC Return?
Yes
- Go To 2
No
- Perform The INTERMITTENT CONDITION Diagnostic Procedure. Refer To INTERMITTENT CONDITION .
- Check The (K31) Fuel Lift Pump Control Circuit For A Short To Ground
- Turn The Ignition Off.
- Disconnect The PCM C2 Harness Connector.
- Disconnect The Pdc C3 Harness Connector.
- Measure The Resistance Between Ground And The (K31) Fuel Lift Pump Control Circuit At The PCM C2 Harness Connector.
Is The Resistance Below 10K Ohms?
Yes
- Repair The (K31) Fuel Lift Pump Control Circuit For A Short To Ground.
- Perform The POWERTRAIN VERIFICATION TEST. Refer To POWERTRAIN VERIFICATION TEST .
No
- Go To 3
- Check The (K31) Fuel Lift Pump Control Circuit For An Open/High Resistance
- Measure The Resistance Of The (K31) Fuel Lift Pump Control Circuit Between The PCM C2 Harness Connector And The Pdc C3 Harness Connector.
Is The Resistance Below 5.0 Ohms?
Yes
- Repair The (K31) Fuel Lift Pump Control Circuit For An Open Or High Resistance.
- Perform The POWERTRAIN VERIFICATION TEST. Refer To POWERTRAIN VERIFICATION TEST .
No
- Go To 4
- Measure The Resistance Of The (K31) Fuel Lift Pump Control Circuit Between The PCM C2 Harness Connector And The Pdc C3 Harness Connector.
- Powertrain Control Module
- Reconnect The PCM C2 And Pdc C3 Harness Connectors.
- Using A Back Probing Tool, Back Probe The (K31) Fuel Lift Pump Control Circuit At The Pdc C3 Harness Connector.
- Turn The Ignition On.
- With The Scan Tool Toggle The Fuel Lift Pump Actuator.
- Using A 12-Volt Test Light Connected To 12 Volts, Probe The (K31) Fuel Lift Pump Control Circuit At The Pdc C3 Harness Connector.NOTE:
The Test Light Should Be Illuminated And Bright. Compare The Brightness To That Of A Direct Connection To The Battery.
Does The Test Light Cycle On And Off Brightly?
Yes
- Replace The Power Distribution Center (Pdc) In Accordance With The Service Information.
- Perform The POWERTRAIN VERIFICATION TEST. Refer To POWERTRAIN VERIFICATION TEST .
No
- Replace The Powertrain Control Module (PCM) In Accordance With The Service Information.
- Perform The POWERTRAIN VERIFICATION TEST. Refer To POWERTRAIN VERIFICATION TEST .