LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 Base, Gas >> Repair and Diagnosis >> External Pages >> Different car >> Section 98 (6.7L Diesel - DTCS - P040D To P1191 - 3500 Cab & Chassis) >> Diagnosis and Testing >> P0593-Speed Control Switch 2 Circuit High >> Testing >> Diagnostic Test

Diagnostic Test

WARNING: This page is about a different car, the 2011 RAM Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
  1. SCAN TOOL SHOWS SPEED CONTROL SWITCH ON/OFF 
    1. Turn the ignition on.
    2. With the scan tool in Inputs/Outputs, read the Speed Control inputs state in PCM.
    3. While monitoring the scan tool, push the Speed Control On/Off Switch several times, then leave it on.

      Did the scan tool show Speed Control Switch off and on?

      Yes 

      No 

      • Go To  2.
  2. S/C WIRING HARNESS VISUAL INSPECTION 
    1. Turn the ignition off.
    2. Using the Schematics as a guide, inspect the Wiring and Connectors.

      Were any problems found?

      Yes 

      No 

      • Go To  3.
  3. CHECK THE CLOCKSPRING 
    Fig 1: Measuring Resistance Of S/C Switch Return Circuit Between Upper And Lower Clockspring Harness Connectors
    GC0090881Courtesy of CHRYSLER LLC
    1. Disconnect the Clockspring C1 and C3 harness connectors.
      NOTE:

      Check connectors - Clean/repair as necessary.

    2. Measure the resistance of the (V937) S/C Switch Return circuit between the Clockspring C1 and C3 harness connectors.
      Fig 2: Measuring Resistance Of S/C Switch Signal Circuits Between Clockspring Harness Connectors
      GC0090887Courtesy of CHRYSLER LLC
    3. Measure the resistance of the (V38) S/C Switch 2 Signal circuit between the Clockspring C1 and C3 harness connectors.

      Was the resistance above 5.0 Ohms for either circuit?

      Yes 

      • Replace the Steering Column Control Module in accordance with the service informtion.
      • Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .

      No 

      • Go To  4.
  4. SPEED CONTROL ON/OFF SWITCH 
    1. Disconnect the Speed Control On/Off Switch harness connector only.
      NOTE:

      Check connectors - Clean/repair as necessary.

    2. Measure the resistance across the S/C On/Off Switch.

      Is the resistance between 20.3K and 20.7K Ohms?

      Yes 

      • Go To  5.

      No 

  5. CHECK THE (V38) S/C SWITCH 2 SIGNAL CIRCUIT FOR A SHORT TO VOLTAGE 
    1. Turn the ignition on.
    2. Measure the voltage of the (V38) S/C Switch 2 Signal circuit at both S/C Switch harness connectors.

      Is the voltage above 6.0 Volts?

      Yes 

      No 

      • Go To  6.
  6. CHECK THE (V38) S/C SWITCH 2 SIGNAL CIRCUIT FOR AN OPEN BETWEEN THE PCM AND CLOCKSPRING 
    1. Turn the ignition off.
    2. Disconnect the PCM harness connector.
      NOTE:

      Check connectors - Clean/repair as necessary.

    3. Measure the resistance of the (V38) S/C Switch Signal 2 circuit between the PCM connector and the Clockspring C1 harness connector.

      Is the resistance below 5.0 Ohms?

      Yes 

      • Go To  7.

      No 

      • Repair the (V38) S/C Switch 2 Signal circuit for an open between the PCM and the Clockspring.
      • Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .
  7. CHECK THE (V38) S/C SWITCH 2 SIGNAL CIRCUIT FOR AN OPEN BETWEEN THE CLOCKSPRING AND S/C SWITCH 
    1. Measure the resistance of the (V38) S/C Switch 2 Signal circuit from the Clockspring C3 harness connector to the S/C Switch harness connectors.

      Is the resistance below 5.0 Ohms?

      Yes 

      • Go To  8.

      No 

      • Repair the (V38) S/C Switch 2 Signal circuit for an open between the Clockspring and the S/C switches.
      • Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .
  8. CHECK THE (V937) S/C SWITCH RETURN CIRCUIT FOR AN OPEN BETWEEN THE CLOCKSPRING AND S/C SWITCHES 
    1. Measure the resistance of the (V937) S/C Switch Return circuit between the S/C harness connectors to the Clockspring C3 harness connector.

      Is the resistance below 5.0 Ohms?

      Yes 

      • Go To  9.

      No 

      • Repair the (V937) S/C Switch Return circuit for an open between the Clockspring and the S/C switches.
      • Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .
  9. CHECK THE (V937) S/C SWITCH RETURN CIRCUIT FOR AN OPEN BETWEEN THE PCM AND CLOCKSPRING 
    1. Measure the resistance of the (V38) S/C Switch Return circuit between the PCM harness connector and the Clockspring C1 harness connector.

      Is the resistance below 5.0 Ohms?

      Yes 

      No 

      • Repair the (V937) S/C Switch Return circuit for an open between the PCM and Clockspring.
      • Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .