Diagnostic Test
WARNING: This page is about a different car, the 2011 RAM Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
- S/C SWITCH VOLTAGE BELOW 1.0 VOLT
- VISUALLY INSPECT THE S/C WIRING HARNESS
- Turn the ignition off.
- Using the Schematics as a guide, inspect the Wiring and Connectors.
Were any problems found?
Yes
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .
No
- Go To 3.
- S/C SWITCH (ON/OFF)
- Turn the ignition off.
- Disconnect the S/C ON/OFF Switch harness connector.NOTE:
Check connectors - Clean/repair as necessary.
- Turn the ignition on.
- With the scan tool in Sensors, read the S/C Switch Volts in the PCM.
Did the S/C Switch voltage change to 5.0 Volts?
Yes
- Replace the S/C ON/OFF Switch in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .
No
- Go To 4.
- S/C SWITCH (RESUME/ACCEL)
- Turn the ignition off.
- Disconnect the S/C RESUME/ACCEL Switch harness connector.NOTE:
Check connectors - Clean/repair as necessary.
- Ignition on, engine not running.
- With the scan tool in Sensors, read the S/C Switch Volts in the PCM.
Did the S/C Switch voltage go above 4.0 Volts?
Yes
- Replace the Resume/Accel Switch in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .
No
- Go To 5.
- CLOCKSPRING
- Turn the ignition off.
- Disconnect the Clockspring C1 harness connector (instrument panel wiring side).
- Turn the ignition on.
- With the scan tool in sensors, read the S/C Switch Volts in the PCM.
Did the S/C Switch voltage change to 5.0 Volts?
Yes
- Replace the Clockspring in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .
No
- Go To 6.
- CHECK THE (V38) S/C SWITCH 2 SIGNAL CIRCUIT FOR A SHORT TO GROUND
- Turn the ignition off.
- Disconnect the S/C ON/OFF Switch harness connector.
- Disconnect the PCM C2 harness connector.NOTE:
Check connectors - Clean/repair as necessary.
- Measure the resistance between ground and the (V38) S/C Switch 2 Signal circuit at S/C ON/OFF Switch harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Repair (V38) S/C Switch 2 Signal circuit for a short to ground.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .
No
- Go To 7.
- CHECK FOR THE (V38) S/C SWITCH 2 SIGNAL CIRCUIT SHORTED TO THE (V937) S/C SWITCH RETURN CIRCUIT
- Measure the resistance between the (V38) S/C Switch 2 Signal circuit and the (V937) S/C Switch Return circuit at the ON/OFF switch harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Repair the short between the (V38) S/C Switch 2 Signal circuit and the (V937) S/C Switch Return circuit.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .
No
- Replace and program the Powertrain Control Module in accordance with the Service Information. Refer to PCM/ECM / TCM PROGRAMMING .
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to POWERTRAIN VERIFICATION TEST - 6.7L .
- Measure the resistance between the (V38) S/C Switch 2 Signal circuit and the (V937) S/C Switch Return circuit at the ON/OFF switch harness connector.