LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2010 >> Sebring Convertible V6-2.7L >> Repair and Diagnosis >> Transmission and Drivetrain >> Drive Axles, Bearings and Joints >> Axle Shaft Assembly >> Service and Repair >> Intermediate Shaft >> Installation

Installation






2.7L





1. Install the intermediate shaft (4).
2. Install the intermediate shaft bolts (1) and (5). Tighten bolt (1) to 38 Nm (28 ft. lb.) and bolts (5) to 23 Nm (17 ft. lb.).
3. Install the heat shield (3).
4. Install the heat shield bolts (2).
5. Install the right half shaft Half Shaft - Installation.