LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2010 >> Sebring Convertible V6-2.7L >> Repair and Diagnosis >> Accessories and Optional Equipment >> Integrated Accessory Switch Assembly >> Service and Repair >> Instrument Cluster Switch Pod - Installation

Instrument Cluster Switch Pod - Installation






INSTALLATION





1. Position the accessory switch bank module (ASBM) in the center bezel and install the four screws (1).
2. Install the instrument panel center bezel (3) Instrument Panel Bezel - Installation.
3. Connect the battery negative cable.