LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> Sebring Convertible V6-3.5L >> Repair and Diagnosis >> Body and Frame >> Roof and Associated Components >> Convertible Top >> Convertible Top Latch Position Switch / Sensor >> Service and Repair >> Power Top Switch - Installation >> Hard Top Panel Latched

Hard Top Panel Latched






INSTALLATION





1. Position the panel latched switch (3) to the panel latch center pivot assembly (1).
2. Install the two rivets (2) securing the switch (3) to the pivot assembly (1).
3. Install the panel to panel latch center pivot assembly (1), Folding Top Latch - Installation.