LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> Sebring Convertible V6-3.5L >> Repair and Diagnosis >> Body and Frame >> Roof and Associated Components >> Convertible Top >> Convertible Top Hydraulic Cylinder >> Service and Repair >> Retractable Hard Top Unique Components >> Folding Top Panel to Panel Hydraulic Cylinder - Installation

Folding Top Panel to Panel Hydraulic Cylinder - Installation






INSTALLATION










NOTE: Take care not to contaminate the hose and cylinder between removal and installation.

1. Connect the hydraulic lines to the cylinder.
2. Close the pump valve.





3. Position the cylinder to the center mid panel latch assembly and install retaining clips (1 and 2).
4. Install the headliner mid panel Convertible Top Headliner - Installation.
5. Fill/bleed the hydraulic system as necessary Water Leak Test.