LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> Sebring Convertible V6-3.5L >> Repair and Diagnosis >> Body and Frame >> Roof and Associated Components >> Convertible Top >> Convertible Top Hydraulic Cylinder >> Service and Repair >> CST And RHT Common Components >> Folding Top Hydraulic Cylinder - Installation >> DeckBar

DeckBar






DECKBAR





1. At the hydraulic cylinder, insert the line end and slide the retaining clamp around the line end.

NOTE: Take care not to contaminate the hose and cylinder between removal and installation.

2. Install the hall effect to the left cylinder. Power Top Switch - Installation.





3. Attach the cylinder (1) onto the deckbar and install the cylinder mounting plate fasteners (2).










NOTE: Make sure to close (2) the hydraulic pump valve. The pump valve will be oriented horizontally when closed.

4. Install the spare tire cover/floor of the trunk.
5. Install the rear and side trunk trim panels. Trunk Trim Panel - Installation.
6. Connect the battery negative remote cable.
7. Close the decklid conventionally.
8. Cycle the system several times and follow the procedure to check fluid level. Procedures.