LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> Sebring Convertible V6-3.5L >> Repair and Diagnosis >> Body and Frame >> Roof and Associated Components >> Convertible Top >> Convertible Top Cable >> Service and Repair >> Convertible Soft Top Unique Components >> Tension Cable - Installation

Tension Cable - Installation





INSTALLATION





1. Carefully insert the the tension cable (1) into the opening in the top cover and guide it through.
2. Install the spring attachement (2) to the rear panel (3).
3. Insert the cable through the front rail and install the retainer screw to the tension cable.
4. Install the retainer and weatherstrip to the convertible top.
5. Install the three retainer mounting fasteners.
6. Install the top cover. Folding Top Cover - Installation.