LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> Sebring Base, 2D Convertible, EDG >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Body - Interior & Exterior >> Convertible Top, Retractable Hard Top Unique Components >> Capture System, Front Panel Down >> Removal >> Down Capture Assembly

Down Capture Assembly

Fig 1: Front & Rear Linkage Rods
GC0122894Courtesy of CHRYSLER LLC
  1. Remove the front and mid/rear panel headliners. See Body/Convertible Top/HEADLINER - Removal .
  2. Remove the front folding top panel from the vehicle. See Body/Convertible Top/TOP, Folding - Removal .
  3. With a grease pencil or equivalent, mark the placement of the down capture assembly to aid in assembly.
  4. Disconnect the front and rear linkage (4) rods from the down capture assembly.
  5. Disconnect the cable (2) from the assembly.
  6. Remove the mounting fasteners and remove the down capture assembly from the convertible top.