LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> Sebring Base, 2D Convertible, EDG >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Body - Interior & Exterior >> Convertible Top, CST And RHT Common Components >> Cylinder, Folding Top Hydraulic >> Removal >> DECKBAR

Cylinder, Folding Top Hydraulic: Removal: DECKBAR

Fig 1: Hydraulic Pump Valve
GC0121105Courtesy of CHRYSLER LLC
OPEN COUNTER CLOCKWISE (CCW) DIRECTION (1)
CLOSE CLOCKWISE (CW) DIRECTION (2)
NOTE: The hydraulic system uses ARAL VITAMOL ZH-M fluid. When replacing components or topping off system due to leak, make sure to use only approved fluid. When adding fluid. See Body/Convertible Top - Standard Procedure .
  1. Open decklid conventionally,
  2. Disconnect and isolate the battery negative remote cable.
  3. Remove the rear and side trunk trim panels. See Body/Interior/PANEL, Trunk Trim - Removal .
  4. Remove the spare tire cover/floor of the trunk.
  5. Release the pump pressure valve (3) by turning it two rotations counter clockwise (1).
    Fig 2: Support Cylinder
    GC0103344Courtesy of CHRYSLER LLC
  6. Using a small flat bladed tool or equivalent, release the retaining clips while pulling the ball socket away from the ball stud.
    Fig 3: Cylinder Mounting Plate Fasteners & Cylinder
    GC0122854Courtesy of CHRYSLER LLC
  7. Remove the cylinder mounting plate fasteners (2) and remove the cylinder (1) from the vehicle.
    Fig 4: Hydraulic Cylinder Hall Effect Switch
    GC0122853Courtesy of CHRYSLER LLC
  8. At the hydraulic cylinder, slide the retaining clamp off and pull out line.
    CAUTION: Be careful to catch all fluid in a catch container.
  9. Remove the hall effect on the left cylinder. Refer to Electrical - Power Systems/Power Top/SWITCH, Power Top - Removal .