Diagnostic Test
WARNING: This page is about a different car, the 2009 Dodge Caliber. However, it is still accessible from the selected car via links, so may be relevant.
- VEHICLE HISTORY AND SERVICE BULLETIN INVESTIGATION
- Turn the ignition on.
- Using the scan tool, read DTCs. Record the related Freeze Frame data if any DTCs are present.
- Check the following items which may assist in repairing the customer's complaint successfully:
- Check the vehicle's repair history. If the vehicle has a repair history that pertains to the customer's current complaint, review the repair.
- Inspect the vehicle for any aftermarket accessories that may have been installed incorrectly.
- Check for any service bulletin(s) related to the customer's complaint or DTCs. If a service bulletin applies, follow the instructions per the service bulletin.
Choose the following scenario that best applies:
The vehicle inspection or service bulletin repaired the customer's complaint.
- Testing complete.
A DTC is present, the vehicle inspection revealed no concerns, no service bulletins apply, or the service bulletin did not repair the customer's complaint.
- Go to step 2
- ACTIVE DIAGNOSTIC TROUBLE CODE (DTC)
- Turn the ignition on.
- Using the scan tool, read the active DTCs.
Does the scan tool display P0443-EVAP PURGE CONTROL CIRCUIT?
Yes
- Go To 3
No
- Test complete, the condition or conditions that originally set this DTC are not present at this time. Using the wiring diagrams as a guide, check all related splices and connectors for signs of water intrusion, corrosion, pushed out or bent terminals, and correct pin tension.
- Perform the CHECKING FOR AN INTERMITTENT DTC diagnostic procedure. See DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
- (K52) EVAP PURGE CONTROL CIRCUIT SHORTED TO VOLTAGE
- Turn the ignition off.
- Disconnect the EVAP Purge Solenoid harness connector.
- Disconnect the PCM harness connectors.
- Turn the ignition on.
- Measure the voltage of the (K52) EVAP Purge Control circuit in the EVAP Purge Solenoid harness connector.
Is there any voltage present?
Yes
- Repair the short to voltage in the (K52) EVAP Purge Control circuit.
- Perform the PCM VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
No
- Go to step 4
- (K52) EVAP PURGE CONTROL CIRCUIT SHORTED TO GROUND
- Turn the ignition off.
- Measure the resistance between ground and the (K52) EVAP Purge Control circuit in the EVAP Purge Solenoid harness connector.
Is the resistance above 100 Ohms?
Yes
- Go to step 5
No
- Repair the short to ground in the (K52) EVAP Purge Control circuit.
- Perform the PCM VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
- (K52) EVAP PURGE CONTROL CIRCUIT OPEN OR EXCESSIVE RESISTANCE
- Measure the resistance of the (K52) EVAP Purge Control circuit between the EVAP Purge Solenoid harness connector and the PCM harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go to step 6
No
- Repair the open or excessive resistance in the (K52) EVAP Purge Control circuit.
- Perform the PCM VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
- Measure the resistance of the (K52) EVAP Purge Control circuit between the EVAP Purge Solenoid harness connector and the PCM harness connector.
- (K70) EVAP PURGE RETURN CIRCUIT OPEN OR EXCESSIVE RESISTANCE
- Measure the resistance of the (K70) EVAP Purge Return circuit between the EVAP Purge Solenoid harness connector and the PCM harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go to step 7
No
- Repair the open or excessive resistance in the (K70) EVAP Purge Return circuit.
- Perform the PCM VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
- Measure the resistance of the (K70) EVAP Purge Return circuit between the EVAP Purge Solenoid harness connector and the PCM harness connector.
- EVAP PURGE SOLENOID
- Connect the PCM harness connectors.
- Turn the ignition on.NOTE: If the DTC is active, the actuation test may not be allowed by the PCM. If may be necessary to clear the DTCs before starting the actuation.
- Using the scan tool, actuate the Evaporative Purge Valve Solenoid Duty Cycle.
- Using a 12-volt test light connected to ground, check the (K52) EVAP Purge Control circuit in the EVAP Purge Solenoid harness connector.NOTE: The voltage supplied to the solenoid circuit during the actuation may be less than battery voltage. The test light should be illuminated, but may not be as bright as a direct connection to the battery.
Is the test light illuminated during the actuation?
Yes
- Replace the EVAP Purge Solenoid in accordance with the Service Information.
- Perform the PCM VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
No
- Go to step 8
- POWERTRAIN CONTROL MODULE (PCM)
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the EVAP Purge Solenoid and the PCM.
- Look for any chafed, pierced, pinched, or partially broken wires.
- Look for broken, bent, pushed out or corroded terminals.
- Perform any Technical Service Bulletins that may apply.
Were any problems found?
Yes
- Repair as necessary.
- Perform the PCM VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .
No
- Replace and program the PCM in accordance with the Service Information.
- Perform the PCM VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Powertrain Control (PCM) - Standard Procedure .