LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> PT Cruiser Limited >> Repair and Diagnosis >> External Pages >> Different car >> Section 34 (Ignition Control (Service Information)) >> SOLENOID, Variable Valve Timing >> Installation >> Front Solenoid 1/1

Front Solenoid 1/1

WARNING: This page is about a different car, the 2009 Dodge Caliber. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Front Variable Valve Timing Solenoid - Removed
GC0082439Courtesy of CHRYSLER LLC
  1. Solenoid for front location 1/1. Note mounting tab location is different between front and rear solenoids.
    Fig 2: Removing/Installing Front Variable Valve Timing Solenoid Mounting Bolt
    GC0082438Courtesy of CHRYSLER LLC
  2. Install solenoid into cylinder head.
  3. Install mounting bolt and tighten to 12 N.m (9 ft. lbs.).
    Fig 3: Removing/Installing Oil Pressure Sensor
    GC0082437Courtesy of CHRYSLER LLC
  4. Install oil pressure sensor.
  5. Connect electrical connector to oil pressure sensor.
  6. Connect electrical connector to Variable valve timing solenoid.
  7. Connect negative battery cable.
  8. Install engine cover.