Diagnostic Test
- CHECK THE BLOWER SPEED SETTING
Was the blower control set to high speed for the entire Cool down Test?
Yes
- Go to step 2
No
- Start the engine, set the blower control to high speed, and then run the Cool down Test again.
- Perform the BODY VERIFICATION TEST. Refer to DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
- CHECK THE (C850) BLOWER SWITCH POSITION SIGNAL CIRCUIT FOR A SHORT TO THE (Z908) GROUND CIRCUIT
Courtesy of CHRYSLER LLC
- Turn the ignition off.
- Disconnect the A/C Heater Control C3 harness connector.
- Measure the resistance between the (C850) Blower Switch Position Signal circuit and the (Z908) Ground circuit in the A/C Heater Control C3 harness connector.
Is the resistance below 10K ohms?
Yes
- Repair the (C850) Blower Switch Position Signal circuit for a short to the (Z908) Ground circuit. Run the Cool down Test again after the repair is complete.
- Perform the BODY VERIFICATION TEST. Refer to DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
No
- Go to step 3
- CHECK THE (C850) BLOWER SWITCH POSITION SIGNAL CIRCUIT FOR A SHORT TO THE (Z909) GROUND CIRCUIT
Courtesy of CHRYSLER LLC
- Disconnect the A/C Heater Control C1 harness connector.
- Measure the resistance between the (C850) Blower Switch Position Signal circuit and the (Z909) Ground circuit in the A/C Heater Control C1 harness connector.
Is the resistance below 10K ohms?
Yes
- Repair the (C850) Blower Switch Position Signal circuit for a short to the (Z909) Ground circuit. Run the Cool down Test again after the repair is complete.
- Perform the BODY VERIFICATION TEST. Refer to DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
No
- Go to step 4
- CHECK THE (C850) BLOWER SWITCH POSITION SIGNAL CIRCUIT VOLTAGE
- Reconnect the A/C Heater Control C1 harness connector.
- Turn the ignition on.
- Measure the voltage of the (C850) Blower Switch Position Signal circuit.
Is the voltage above 4.8 volts?
Yes
- Check the blower motor and related circuits for the cause of blower operation problems and repair as necessary. Run the Cool down Test again after the repair is complete.
- Perform the BODY VERIFICATION TEST. Refer to DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
No
- Go to step 5
- CHECK THE (C850) BLOWER SWITCH POSITION SIGNAL CIRCUIT FOR A SHORT TO GROUND
- Measure the resistance of the (C850) Blower Switch Position Signal circuit between ground and the A/C Heater Control C3 harness connector.
Is the resistance below 10K ohms?
Yes
- Repair the (C850) Blower Switch Position Signal circuit for a short to ground. Run the Cool down Test again after the repair is complete.
- Perform the BODY VERIFICATION TEST. Refer to DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
No
- Go to step 6
- Measure the resistance of the (C850) Blower Switch Position Signal circuit between ground and the A/C Heater Control C3 harness connector.
- CHECK (C850) BLOWER SWITCH POSITION SIGNAL CIRCUIT FOR AN OPEN
- Measure the resistance of the (C850) Blower Switch Position Signal circuit between the A/C Heater Control C1 harness connector and the A/C Heater Control C3 harness connector.
Is the resistance below 5.0 ohms?
Yes
- Replace the A/C Heater Control in accordance with the Service Information. Run the Cool down Test again after the repair is complete.
- Perform the BODY VERIFICATION TEST. Refer to DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
No
- Repair the (C850) Blower Switch Position Signal circuit for an open. Run the Cool down Test again after the repair is complete.
- Perform the BODY VERIFICATION TEST. Refer to DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
- Measure the resistance of the (C850) Blower Switch Position Signal circuit between the A/C Heater Control C1 harness connector and the A/C Heater Control C3 harness connector.