LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> (HVAC Systems (MTC) - Electrical Diagnostics) >> DTC Troubleshooting >> DTC 73: Ac Request Output Signal Too High >> Diagnostic Test

Diagnostic Test

  1. CHECK (C105) HVAC MUX CONTROL CIRCUIT VOLTAGE AT A/C HEATER CONTROL C1 HARNESS CONNECTOR 
    Fig 1: Checking HVAC MUX Control Circuit Voltage At A/C Heater Control C1 Harness Connector
    GC0096413Courtesy of CHRYSLER LLC
    1. Turn the ignition off.
    2. Disconnect the A/C Heater Control C1 harness connector.
    3. Turn the ignition on.
    4. Measure the voltage of the (C105) HVAC MUX Control circuit.

      Is the voltage above 5.2 volts?

      Yes 

      • Go to step  2

      No 

  2. CHECK (C105) HVAC MUX CONTROL CIRCUIT FOR A SHORT TO VOLTAGE 
    Fig 2: Checking HVAC MUX Control Circuit Voltage At A/C Heater Control C1 Harness Connector
    GC0096413Courtesy of CHRYSLER LLC
    1. Turn the ignition off.
    2. Disconnect the Instrument Cluster C2 harness connector.
    3. Turn the ignition on.
    4. Measure the voltage of the (C105) HVAC MUX Control circuit.

      Is the voltage above 0.2 volts?

      Yes 

      No