LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (42RLE Automatic Transmission (Service Information)) >> SOLENOID, Pressure Control >> Installation >> Installation

SOLENOID, Pressure Control: Installation: Installation

WARNING: This page is about a different variant/trim than selected.
Fig 1: Variable Line Pressure Components
GC0082079Courtesy of CHRYSLER LLC
1 - PRESSURE CONTROL SOLENOID
2 - LINE PRESSURE SENSOR
3 - SHOULDER SCREW
4 - VARIABLE LINE PRESSURE HEADER
5 - MANUAL SHAFT
6 - SCREWS
  1. Install the pressure control solenoid (1) and line pressure sensor (2) into the valve body.
  2. Install the screws (6) to hold the pressure control solenoid (1) and line pressure sensor (2) to the valve body.
  3. Install the electrical connectors to the pressure control solenoid (1) and the line pressure sensor (2).
  4. Install the valve body into the transmission. See Transmission and Transfer Case/Automatic - 42RLE/VALVE BODY - Installation .