Air Distribution Duct
WARNING: This page is about a different car, the 2006 Chrysler PT Cruiser. However, it is still accessible from the selected car via links, so may be relevant.
- Position the air distribution duct (2) into the back of the instrument panel cover (3).
- Install the six screws (1) that secure the air distribution duct to the instrument panel cover. Tighten the screws to 2 N.m (17 in. lbs.).
- Install the instrument panel support into the instrument panel assembly (Refer to BODY/INSTRUMENT PANEL/SUPPORT-INSTRUMENT PANEL - INSTALLATION) .
- Install the instrument panel assembly (Refer to BODY/INSTRUMENT PANEL/ASSEMBLY-INSTRUMENT PANEL - INSTALLATION) .