LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 54 (Engine Controls - DTCS P0700 To P1897) >> Diagnosis And Testing >> P1604-Pcm Internal Dual-Port Ram Read/Write Integrity Failure >> Diagnostic Test

Diagnostic Test

WARNING: This page is about a different car, the 2006 Dodge Magnum, 2006 Dodge Charger, and 2006 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
  1. 1)  PCM IGNITION CIRCUITS 
    Fig 1: Checking PCM Fused Ignition Switch Circuits
    GC0015115Courtesy of DAIMLERCHRYSLER CORP.

    Turn the ignition off.

    Disconnect the PCM harness connectors.

    Ignition on, engine not running.

    CAUTION: Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install Miller Special Tool #8815 to perform diagnosis.

    With a 12-volt test light connected to ground and with special tool #8815 installed, probe the (F202) and (F924) Fused Ignition Switch circuits.

    Perform the above check with the Ignition key in the off lock position, Ignition on, engine not running position, and during cranking.

    Wiggle the related wire harness while probing the special tool with the test light to try to interrupt the circuit.

    Does the test light illuminate brightly? 

    Yes 

    1. Go To  2).

    No 

    1. Repair the open or excessive resistance in the (F202) and (F924) Fused Ignition Switch (Off, Run, Start) circuits. Inspect the related fuse, if the fuse is open check the circuits for a short to ground.
    2. Perform POWERTRAIN VERIFICATION TEST .
  2. 2)  PCM 

    The Powertrain Control Module is reporting internal errors.

    NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.

    Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.

    Were there any problems found? 

    Yes 

    1. Repair as necessary.
    2. Perform POWERTRAIN VERIFICATION TEST .

    No 

    1. Replace and program the Powertrain Control Module per Service Information.
    2. Perform POWERTRAIN VERIFICATION TEST .