LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 52 (Engine Controls - DTCS P0481 To P0580) >> Diagnosis And Testing >> P0522-Engine Oil Pressure Sensor Circuit Low >> Diagnostic Test

Diagnostic Test

WARNING: This page is about a different car, the 2006 Dodge Magnum, 2006 Dodge Charger, and 2006 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
  1. 1)  ACTIVE DTC 
    NOTE: Ensure that the engine oil is at the proper level. Also, check the customers oil change history to ensure that the oil is being changed at the correct intervals and that the proper oil viscosity is being used.

    Ignition on, engine not running.

    With a scan tool, read DTCs.

    Is the DTC active at this time? 

    Yes 

    1. Go To  2).

    No 

    1. Refer to INTERMITTENT CONDITION .
    2. Perform POWERTRAIN VERIFICATION TEST .
  2. 2)  (F856) 5-VOLT SUPPLY CIRCUIT 

    Turn the ignition off.

    Disconnect the Engine Oil Pressure Sensor harness connector.

    Ignition on, engine not running.

    Measure the voltage on the (F856) 5-volt Supply circuit in the Engine Oil Pressure Sensor harness connector.

    Is the voltage between 4.8 to 5.2 volts? 

    Yes 

    1. Go To  3).

    No 

    1. Go To  6).
  3. 3)  ENGINE OIL PRESSURE SENSOR 

    With a scan tool, monitor the Engine Oil Pressure Sensor voltage with the Sensor harness connector disconnected.

    Is the voltage above 4.5 volts? 

    Yes 

    1. Replace the Engine Oil Pressure Sensor.
    2. Perform POWERTRAIN VERIFICATION TEST .

    No 

    1. Go To  4).
  4. 4)  (G6) ENGINE OIL PRESSURE SIGNAL CIRCUIT SHORTED TO GROUND 
    Fig 1: Checking Engine Oil Pressure Sensor Signal Circuit
    GC0039861Courtesy of DAIMLERCHRYSLER CORP.

    Turn the ignition off.

    Disconnect the PCM harness connectors.

    Measure the resistance between ground and the (G6) Engine Oil Pressure Signal circuit in the Engine Oil Pressure Sensor harness connector.

    Is the resistance below 100 ohms? 

    Yes 

    1. Repair the short to ground in the (G6) Engine Oil Pressure Signal circuit.
    2. Perform POWERTRAIN VERIFICATION TEST .

    No 

    1. Go To  5).
  5. 5)  (G6) ENGINE OIL PRESSURE SIGNAL CIRCUIT SHORTED TO THE (K900) SENSOR GROUND CIRCUIT 

    Measure the resistance between the (G6) Engine Oil Pressure Sensor Signal circuit and the (K900) Sensor Ground circuit in the Engine Oil Pressure Sensor harness connector.

    Is the resistance below 100 ohms? 

    Yes 

    1. Repair the short between the (K900) Sensor Ground circuit and the (G6) Engine Oil Pressure Signal circuit.
    2. Perform POWERTRAIN VERIFICATION TEST .

    No 

    1. Go To  8).
  6. 6)  (F856) 5-VOLT SUPPLY CIRCUIT OPEN 
    Fig 2: Checking 5-Volt Supply Circuit
    GC0039862Courtesy of DAIMLERCHRYSLER CORP.

    Turn the ignition off.

    Disconnect the PCM harness connectors.

    CAUTION: Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install Miller Special Tool #8815 to perform diagnostics.

    Measure the resistance of the (F856) 5-volt Supply circuit from the Engine Oil Pressure Sensor harness connector to the appropriate terminal of special tool #8815.

    Is the resistance below 5.0 ohms? 

    Yes 

    1. Go To  7).

    No 

    1. Repair the open in the (F856) 5-volt Supply circuit.
    2. Perform POWERTRAIN VERIFICATION TEST .
  7. 7)  (F856) 5-VOLT SUPPLY CIRCUIT SHORTED TO GROUND 
    Fig 3: Checking 5-Volt Supply Circuit
    GC0039863Courtesy of DAIMLERCHRYSLER CORP.

    Measure the resistance between ground and the (F856) 5-volt Supply circuit in the Engine Oil Pressure Sensor harness connector.

    Is the resistance below 100 ohms? 

    Yes 

    1. Repair the short to ground in the (F856) 5-volt Supply circuit.
    2. Perform POWERTRAIN VERIFICATION TEST .

    No 

    1. Go To  8).
  8. 8)  PCM 
    NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.

    Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.

    Were there any problems found? 

    Yes 

    1. Repair as necessary.
    2. Perform POWERTRAIN VERIFICATION TEST .

    No 

    1. Replace and program the Powertrain Control Module per Service Information.
    2. Perform POWERTRAIN VERIFICATION TEST .