Diagnostic Test
WARNING: This page is about a different car, the 2010 Dodge Charger and 2010 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK FOR ACTIVE DTC
- With the scan tool, read the active DTC's.
- Cycle the ignition switch from off to on, leaving the ignition on for a minimum of 90 seconds.
- With the scan tool, read the active DTC's.
Does the scan tool display this DTC as active?
Yes
- Go to step 2
No
- If the DTC is stored, check for an intermittent condition. Visually inspect the related wiring harness connectors. Look for broken, bent, pushed out, or corroded terminals.
- RUN RELAY
- Turn the ignition off.
- Install a substitute Run Relay in place of the original Run Relay.
- Cycle the ignition switch from off to on, leaving the ignition on for a minimum of 90 seconds.
- With the scan tool, read the DTC's.
Does the scan tool display this DTC as active?
Yes
- Go to step 3
No
- Replace the original Run Relay.
- Perform BODY VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
- (F923) RUN RELAY CONTROL CIRCUIT OPEN
- Turn the ignition off.
- Disconnect the TIPM C1 harness connector.
- Remove the Run Relay from the Rear Power Distribution Module.
- Measure the resistance of the Run Relay Control circuit.
Is the resistance below 10K ohms?
Yes
- Go to step 4
No
- Repair the (F923) Run Relay Control circuit for an open.
- Perform BODY VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
- (F923) RUN RELAY CONTROL CIRCUIT SHORTED TO GROUND
Courtesy of CHRYSLER LLC
- Measure the resistance between ground and the (F923) Run Relay Control circuit at the TIPM C1 harness connector.
Is the resistance below 10K ohms?
Yes
- Repair the (F923) Run Relay Control circuit for a short to ground.
- Perform BODY VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
No
- Inspect the wiring and connectors for damage or shorted circuits. If OK, replace and program the TIPM in accordance with the service information.
- Perform BODY VERIFICATION TEST. See DTC-Based Diagnostics/MODULE, Totally Integrated Power (TIPM) - Standard Procedure
- Measure the resistance between ground and the (F923) Run Relay Control circuit at the TIPM C1 harness connector.