LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 327 (Rear Axle - 200MM) >> Adjustments >> Pinion Depth >> Pinion Depth Measurement

Pinion Depth Measurement

WARNING: This page is about a different car, the 2010 Dodge Charger and 2010 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.

Pinion depth measurement is taken with the pinion head and tail bearing cups pressed into the axle housing without the shim.

Fig 1: Pinion Head Bearing Cup Installation
GC0095018Courtesy of CHRYSLER LLC
  1. Press pinion head bearing cup into housing using Handle C-4171 (1) and Installer C-4310 (2).
    Fig 2: Pinion Tail Bearing Cup Installation
    GC0081473Courtesy of CHRYSLER LLC
  2. Press pinion tail bearing cup into housing using Handle C-4171 (1) and Installer D-146 (2).
    Fig 3: L-Block, Gage Block and Bearing
    GC0081474Courtesy of CHRYSLER LLC
  3. Assemble Pinion Height Block 6739 (3), Pinion Head Bearing Cone (1), Screw 6741 (all these can be found in a Pinion Gauge Set such as 6774), and Pinion Height Gage Block 9227 (2). Install assembly into axle housing and through bearing cups.
    Fig 4: Pinion Depth Gauge Tools - Typical
    GC0095019Courtesy of CHRYSLER LLC
  4. Install pinion tail bearing and Cone 6740 (4). Tighten Cone 6740 by hand until 3.4 N.m (30 in. lbs.) of rotating torque is measured at Screw 6741 (5).
    Fig 5: Remove/Install Arbor Discs
    GC0081475Courtesy of CHRYSLER LLC
  5. Install Arbor Discs 9228 (1).
    Fig 6: Remove/Install Arbor Bar
    GC0095020Courtesy of CHRYSLER LLC
  6. Install Arbor Bar D-115-3 (1) from a Pinion Gauge Set such as 6774.
    Fig 7: Pinion Gage Setup
    GC0095021Courtesy of CHRYSLER LLC
  7. Verify pinion depth setup is as shown in illustration.
    Fig 8: Indicator/Scooter Block Setup
    GC0081476Courtesy of CHRYSLER LLC
  8. Install Dial Indicator 9524 (1) to Scooter Block D-115-2A (2) ( from a Pinion Gauge Set such as 6774). Secure with set-screw (3).
    Fig 9: Zero Dial Indicator on L-Block
    GC0081477Courtesy of CHRYSLER LLC
  9. Install Indicator/Block assembly to top of Pinion Height Block 6739 (1). Zero indicator on top surface.
    Fig 10: Measure and Record Required Shim
    GC0095022Courtesy of CHRYSLER LLC
  10. Slide indicator probe off of height block and onto Arbor Bar D-115-3 (2). As indicator contacts Arbor Bar (2), indicator needle will rotate clockwise. Continue moving indicator probe to the crest of the arbor bar and record the highest reading.
  11. Select a shim equal to the dial indicator reading minus 2.5 mm (0.09 in.). After shim installation, check the amount of pinion bearing preload, and adjust as required to achieve the correct turning torque.