Section 305 (Starting System (Service Information)): Starter: Installation: 6.1L
WARNING: This page is about a different car, the 2010 Dodge Charger and 2010 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
- Position the starter (2) into the transmission but do not install bolts.
- Connect the solenoid wire to the starter motor (snaps on).
- Position the battery cable to the solenoid stud. Install the battery cable eyelet nut.
Tighten to 11 N.m (8 Ft. Lbs.).
- Install the three mounting bolts (1).
Tighten to 54 N.m (40 Ft. Lbs.).
- Position the heat shield (3) and install the two shield mounting nuts (2).
- Lower the vehicle.
- Connect the negative battery cable.