LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 301 (Steering System) >> Pump >> HOSE, Power Steering, Pressure >> Installation >> Rear-Wheel-Drive

HOSE, Power Steering, Pressure: Installation: Rear-Wheel-Drive

WARNING: This page is about a different car, the 2010 Dodge Charger and 2010 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: HOSES AT RWD STEERING GEAR
GC0080537Courtesy of CHRYSLER LLC
  1. Install pressure hose in engine compartment from underneath.
    NOTE: Always use a NEW O-ring on the end of the pressure hose.
  2. Lubricate NEW O-ring on steering gear end of pressure hose with clean power steering fluid.
  3. Install pressure hose (2) to steering gear (1). Do not tighten tube nut at this time. 
    Fig 2: HOSE ROUTING ALONG ENGINE CRADLE
    GC0080558Courtesy of CHRYSLER LLC
  4. Route pressure hose along right side of engine cradle. Position pressure hose (1) routing clamp over return hose (2) routing clamp, then install screw (4) securing hoses to right side of engine cradle (3).
  5. Route pressure hose along front of engine cradle. Install screw (5) through routing clamp securing hose to front of engine cradle (3).
    Fig 3: HOSES AT RWD STEERING GEAR
    GC0080537Courtesy of CHRYSLER LLC
  6. Tighten pressure hose tube nut at steering gear to 47 N.m (35 ft. lbs.).
  7. Install belly pan. Refer to Frame and Bumpers/Under Body Protection/BELLY PAN - Installation
  8. Lower vehicle.
    NOTE: Always use a NEW O-ring on the end of the pressure hose.
  9. Lubricate NEW O-ring on power steering pump end of pressure hose with clean power steering fluid.
    Fig 4: PRESSURE HOSE AT PUMP - 3.5L
    GC0080547Courtesy of CHRYSLER LLC
  10. 2.7L/3.5L Engines - Install pressure hose (2) to pump (1). Tighten pressure hose tube nut to 47 N.m (35 ft. lbs.).
    Fig 5: PRESSURE HOSE AT PUMP - 5.7L
    GC0080550Courtesy of CHRYSLER LLC
  11. 5.7L/6.1L Engines - Install pressure hose (2) to pump (1). Tighten pressure hose tube nut to 47 N.m (35 ft. lbs.).
    Fig 6: PRESSURE HOSE AT PUMP - 3.0L DIESEL
    GC0080553Courtesy of CHRYSLER LLC
  12. 3.0L Diesel Engine - Install pressure hose (2) to pump (1). Tighten pressure hose tube nut to 47 N.m (35 ft. lbs.).
    Fig 7: BATTERY AND CABLES
    GC0079763Courtesy of CHRYSLER LLC
  13. Install air cleaner housing and inlet tube. Refer to Engine/Air Intake System/BODY, Air Cleaner - Installation
  14. Connect battery negative cable (2) to battery post. It is important that this is performed properly. Refer to Electrical/Battery System - Standard Procedure
  15. Fill and bleed power steering system. See Steering - Standard Procedure