LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 287 (Engine Cooling System & Automatic Transmission Cooling System) >> Engine >> Thermostat >> Installation >> 3.0L Diesel

3.0L Diesel

WARNING: This page is about a different car, the 2010 Dodge Charger and 2010 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
  1. Clean all sealing surfaces.
  2. Position and install thermostat housing Tighten bolts to 9 N.m (80 in. lbs.).
    NOTE: Inspect condition of all clamps and hoses, replace as necessary.
  3. Connect coolant hoses,
  4. Install bracket for fuel line.
  5. Close coolant drain.
  6. Install engine cover. Refer to Engine - Installation .
  7. Connect negative battery cable.
  8. Fill coolant system to proper level. See Cooling - Standard Procedure .
  9. Start engine and inspect for leaks.