Intake Manifold-Lower
WARNING: This page is about a different car, the 2008 Dodge Magnum, 2008 Dodge Charger, and 2008 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
- Clean all sealing surfaces.
- Position new gaskets and intake manifold on cylinder head surfaces.
- Install intake manifold bolts and gradually tighten in sequence shown in illustration until a torque of 28 N.m (250 in. lbs.) is obtained. See Fig 1.
1 - FUEL RAIL 2 - IGNITION COIL 3 - LOWER INTAKE MANIFOLD 4 - PCV VALVE - Install fuel rail and injectors as an assembly. See Fig 2. Refer to INSTALLATION .
- Connect fuel supply hose to fuel rail. Refer to STANDARD PROCEDURE
.
1 - COOLANT PIPE 2 - HEATER HOSE 3 - COOLANT RESERVOIR HOSE - Connect heater hose to rear lower intake manifold. See Fig 3.
- Connect coolant container hose to the rear lower intake manifold. See Fig 3.
- Connect electrical connectors to fuel injectors and coolant temperature sensor.
- Install power steering fluid reservoir and bracket.
- Install upper intake manifold. See INSTALLATION .
- Connect the upper radiator hose to the thermostat housing.
- Fill the cooling system.