LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 241 (2.7L Engine (Service Information)) >> Cylinder Head >> Installation >> Cylinder Head

Cylinder Head

WARNING: This page is about a different car, the 2008 Dodge Magnum, 2008 Dodge Charger, and 2008 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Checking Cylinder Head Bolts for Stretching (Necking)
GC0003797Courtesy of CHRYSLER LLC
NOTE: The cylinder head bolts are tightened using a torque plus angle procedure. The bolts must be examined BEFORE reuse. If the threads are necked down the bolts must be replaced

Necking can be checked by holding a straight edge against the threads (3). If all the threads do not contact the scale (2), the bolt must be replaced.

CAUTION: When cleaning cylinder head and cylinder block surfaces, DO NOT use a metal scraper because the surfaces could be cut or ground. Use ONLY a wooden or plastic scraper.
  1. Clean sealing surfaces of cylinder head and block. See STANDARD PROCEDURE .
  2. Install new head gasket over locating dowels.
  3. Install cylinder head to block, assuring head is properly positioned over locating dowels.
    Fig 2: Cylinder Head Tightening Sequence
    GC0015284Courtesy of CHRYSLER LLC
  4. Lubricate bolt threads with clean engine oil and install bolts.
  5. Tighten bolts in sequence shown in illustration for left head (2) and right head (1), using the following steps and torque values:
    1. Step 1: Bolts 1-8 to 48 N.m (35 ft. lbs.)
    2. Step 2: Bolts 1-8 to 75 N.m (55 ft. lbs.)
    3. Step 3: Bolts 1-8 to 75 N.m (55 ft. lbs.)
    4. Step 4: Bolts 1-8 to +90° Turn Do not use a torque wrench for this step. 
    5. Step 5: Bolts 9-11 to 28 N.m (250 in. lbs.)
  6. For left cylinder head installation:
    1. Install engine oil dipstick tube.
    2. Install generator.
  7. For right cylinder head Installation:
    1. Install cylinder head ground strap.
    2. Install EGR valve (if equipped). Refer to INSTALLATION .
    Fig 3: Camshaft Bearing Cap Tightening Sequence
    GC0015285Courtesy of CHRYSLER LLC
  8. Install all valvetrain components and camshafts. See INSTALLATION . Tighten camshaft bearing caps in sequence shown in illustration to 12 N.m (105 in. lbs.).
    Fig 4: Timing Chain Alignment Marks - Primary
    GC0015281Courtesy of CHRYSLER LLC
  9. Install primary timing chain (7), guides (2, , 0) and sprockets (9). See INSTALLATION .
    Fig 5: Water Outlet Connector
    GC0015275Courtesy of CHRYSLER LLC
  10. Install coolant outlet (3). Refer to INSTALLATION .
    Fig 6: Identifying Serpentine Accessory Drive Belt
    GC0015230Courtesy of CHRYSLER LLC
  11. Install lower intake manifold. See INSTALLATION .
  12. Install cylinder head covers. See INSTALLATION .
  13. Connect camshaft position sensor (2) and coolant temperature sensor (1) connectors.
  14. Install timing chain cover. See INSTALLATION .
  15. Install crankshaft vibration damper. See INSTALLATION .
  16. Install upper intake manifold. See INSTALLATION .
    Fig 7: Locating Oil Pressure Switch
    GC0015225Courtesy of CHRYSLER LLC
  17. Connect oil pressure sensor (1) connector.
    Fig 8: Identifying Serpentine Accessory Drive Belt
    GC0015230Courtesy of CHRYSLER LLC
  18. Install accessory drive belt (5). Refer to INSTALLATION .
  19. Fill cooling system.
    Fig 9: Locating Battery
    GC0015222Courtesy of CHRYSLER LLC
  20. Connect negative battery (1) cable.
  21. Start engine and check for leaks.