Pinion Depth Measurement
WARNING: This page is about a different car, the 2008 Dodge Magnum, 2008 Dodge Charger, and 2008 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
Pinion depth measurement is taken with the pinion head and tail bearing cups pressed into the axle housing without the shim.
- Press pinion head bearing cup into housing using Handle C-4171 (1) and Installer C-4310 (2).
- Press pinion tail bearing cup into housing using Handle C-4171 (1) and Installer D-146 (2).
- Assemble Pinion Height Block 6739 (3), Pinion Head Bearing Cone (1), Screw 6741 (all these can be found in a Pinion Gauge Set such as 6774), and Pinion Height Gage Block 9085 (2). Install assembly into axle housing and through bearing cups.
- Install pinion tail bearing and Cone 6740 (4). Tighten Cone 6740 by hand until 3.4 N.m (30 in. lbs.) of rotating torque is measured at Screw 6741 (5).
- Install Arbor Discs 9083 (1).
- Install Arbor Bar D-115-3 (1) from a Pinion Gauge Set such as 6774.
- Verify pinion depth setup is as shown.
- Install Dial Indicator 9524 (1) to Scooter Block D-115-2A (2) (from a Pinion Gauge Set such as 6774). Secure with set-screw (3).
- Install Indicator/Block assembly to top of Height Block 6739 (1). Zero indicator on top surface.
- Slide indicator probe off of height block and onto Arbor Bar D-115-3 (2). As indicator contacts Arbor Bar (2), indicator needle will rotate clockwise. Continue moving indicator probe to the crest of the arbor bar and record the highest reading.
- Select a shim equal to the dial indicator reading plus the drive pinion gear depth variance number etched into the pinion face (1). For example, if the depth variance is -01, subtract 0.01 mm (0.0004 in.) from dial indicator reading.
- Using Handle C-4171 (2) and Remover 9084 (1), drive out pinion head bearing cup and insert specified shim.