LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 220 (Steering System) >> Pump >> Hose - Pressure >> Installation >> Pressure Hose - AWD

Pressure Hose - AWD

WARNING: This page is about a different car, the 2008 Dodge Magnum, 2008 Dodge Charger, and 2008 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install pressure hose in engine compartment from underneath.
    Fig 1: Hoses at AWD Gear
    GC0013290Courtesy of CHRYSLER LLC
    NOTE: Always use a NEW O-ring on the end of the pressure or return hose at the gear.
  2. Lubricate NEW O-ring on steering gear end of pressure hose with clean power steering fluid.
  3. Insert pressure hose into steering gear (2) port and install tube nut (3). Do not tighten tube nut at this time. 
  4. Lubricate NEW O-ring on steering gear end of return hose with clean power steering fluid.
  5. Insert return hose into steering gear (2) port and install tube nut (1). Do not tighten tube nut at this time. 
    Fig 2: Hose Mounting Bracket to Cradle
    GC0013312Courtesy of CHRYSLER LLC
  6. Route pressure hose along left side of engine cradle. Install screw through routing clamp and secure hose to left side of engine cradle.
  7. Route pressure hose along front of engine cradle. Install screw through routing clamp (1) and secure hose to front of engine cradle (2).
    Fig 3: Hoses at AWD Gear
    GC0013290Courtesy of CHRYSLER LLC
  8. Tighten pressure (3) and return (1) hose tube nuts at steering gear (2) to 47 N.m (35 ft. lbs.).
  9. Install belly pan. Refer to INSTALLATION .
  10. Lower vehicle.
    NOTE: Always use a NEW O-ring on the end of the pressure hose.
  11. Lubricate NEW O-ring on power steering pump end of pressure hose with clean power steering fluid.
    Fig 4: Remove/Install Pressure Hose At Pump - 2.7L/3.5L
    GC0013303Courtesy of CHRYSLER LLC
  12. 3.5L Engine - Install pressure hose (2) to pump (1). Tighten pressure hose tube nut to 47 N.m (35 ft. lbs.).
    Fig 5: Remove/Install Pressure Hose at Pump - 5.7L/6.1L
    GC0013306Courtesy of CHRYSLER LLC
  13. 5.7L/6.1L Engine - Install pressure hose (2) to pump (1). Tighten pressure hose tube nut to 47 N.m (35 ft. lbs.).
  14. Install air cleaner housing and inlet tube. Refer to INSTALLATION (ENGINE - 2.7L). Refer to INSTALLATION (ENGINE - 3.5L). Refer to INSTALLATION (ENGINE - 5.7L). Refer to INSTALLATION (ENGINE - 6.1L).
    Fig 6: Disconnecting/Connecting Battery Cables
    GC0012970Courtesy of CHRYSLER LLC
  15. Connect battery negative cable (2) to battery post. It is important that this is performed properly. Refer to STANDARD PROCEDURE .
  16. Fill and bleed power steering system. See STANDARD PROCEDURE .