LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 200 (DTCS P0016 To P0128, Intermittent Condition, Checking Exhaust System, Temperature Sensors, Power & Ground Circuits) >> P0032-O2 Sensor 1/1 Heater Circuit High >> Diagnostic Test

Diagnostic Test

WARNING: This page is about a different car, the 2007 Chrysler PT Cruiser. However, it is still accessible from the selected car via links, so may be relevant.
  1. 1) ACTIVE DTC 

    Ignition on, engine not running.

    With a scan tool, read DTCs.

    Is the DTC active at this time? 

    Yes 

    1. Go to  2).

    No 

    1. Refer to INTERMITTENT CONDITION .
    2. Perform POWERTRAIN VERIFICATION TEST .
  2. 2) O2 HEATER ELEMENT 

    Turn the ignition off.

    NOTE: Allow the O2 Sensor to cool down to room temperature.

    Disconnect the 1/1 O2 Sensor harness connector.

    Measure the resistance across the O2 Sensor Heater element between the O2 Heater Control terminal and the O2 Heater ground terminal at the component.

    NOTE: O2 Heater Element resistance values should be measured at 70°F (21.1°C). The resistance value will vary with different temperature values.

    Is the O2 Sensor Heater Element resistance between 2.0 and 30.0 ohms? 

    Yes 

    1. Go to  3).

    No 

    1. Replace the O2 Sensor.
    2. Perform POWERTRAIN VERIFICATION TEST .
  3. 3) (K99) O2 1/1 HEATER CONTROL CIRCUIT  
    Fig 1: Checking O2 Sensor Heater Control Circuit With 12-Volt Test Light
    GC0041520Courtesy of CHRYSLER LLC

    Ignition on, engine not running.

    With a scan tool, actuate the O2 1/1 Heater Test with the Sensor harness connector still disconnected.

    Using a 12-volt test light connected to ground, probe the (K99) O2 1/1 Heater Control circuit in the O2 Sensor harness connector.

    Does the test light illuminate brightly and flash on and off during the actuation? 

    Yes 

    1. Go to  4).

    No 

    1. Go to  5).
  4. 4) (Z902) O2 1/1 HEATER GROUND CIRCUIT OPEN 
    Fig 2: Measuring Resistance Between Ground & O2 1/1 Heater Ground Circuit
    GC0041522Courtesy of CHRYSLER LLC

    Turn the ignition off.

    Measure the resistance between an engine ground and the (Z902) O2 1/1 Heater ground circuit in the O2 Sensor harness connector.

    Is the resistance below 5.0 ohms? 

    Yes 

    1. Replace the O2 Sensor.
    2. Perform POWERTRAIN VERIFICATION TEST .

    No 

    1. Repair the open in the (Z902) O2 1/1Heater ground circuit.
    2. Perform POWERTRAIN VERIFICATION TEST .
  5. 5) (K99) O2 1/1 HEATER CONTROL CIRCUIT SHORTED TO BATTERY VOLTAGE 
    Fig 3: Measuring Voltage On O2 1/1 Heater Control Circuit
    GC0041523Courtesy of CHRYSLER LLC

    Turn the ignition off.

    Disconnect the PCM harness connectors.

    Ignition on, engine not running.

    Measure the voltage on the (K99) O2 1/1 Heater Control circuit in the O2 Sensor harness connector.

    Does the voltmeter indicate any voltage present? 

    Yes 

    1. Repair the short to battery voltage in the (K99) O2 1/1 Heater Control circuit.
    2. Perform POWERTRAIN VERIFICATION TEST .

    No 

    1. Go to  6).
  6. 6) (K99) O2 1/1 HEATER CONTROL CIRCUIT OPEN 
    Fig 4: Measuring Resistance Of O2 Heater Control Circuit
    GC0041524Courtesy of CHRYSLER LLC

    Turn the ignition off.

    CAUTION: Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install Miller Special Tool #8815 to perform diagnosis.

    Measure the resistance of the (K99) O2 1/1 Heater Control circuit from the O2 Sensor harness connector to the appropriate terminal of special tool #8815.

    Is the resistance below 5.0 ohms? 

    Yes 

    1. Go to  7).

    No 

    1. Repair the open in the (K99) O2 1/1 Heater Control circuit.
    2. Perform POWERTRAIN VERIFICATION TEST .
  7. 7) PCM 
    NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage or terminal push out. Repair as necessary.

    Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.

    Were there any problems found? 

    Yes 

    1. Repair as necessary.
    2. Perform POWERTRAIN VERIFICATION TEST .

    No 

    1. Replace and program the Powertrain Control Module per Service Information.
    2. Perform POWERTRAIN VERIFICATION TEST .