Upper Intake Manifold
- Clean and inspect the gasket sealing surfaces.
- Position the new gasket.
- Install the upper intake manifold insulator foam.
- Install the upper intake manifold. Tighten the bolts to 12 N.m (105 in. lbs.) starting in the center working outward in a cross sequence pattern.
- Install the intake manifold support brackets. Tighten fasteners (2) to 12 N.m (105 in. lbs.).
1 - Manifold Tuning Valve 2 - Short Runner Valve - Connect the electrical connectors to the manifold tuning valve (1) and short runner valve (2).
1 - PCV HOSE 2 - PURGE HOSE 3 - BRAKE BOOSTER HOSE 4 - THROTTLE BRACKET 5 - ELECTRONIC THROTTLE CONTROL - Install the throttle bracket (4). Tighten fasteners to 12 N.m (105 in. lbs.) at the throttle body and 28 N.m (259 in. lbs.) at the cylinder head.
- Connect the harness connector to the electronic throttle control (5).
- Connect the PCV hose (1), purge hose (2) and power brake booster vacuum hose (3) to the intake manifold.
- Install the EGR tube (1), strut tower support, wiper module and cowl panel. Refer to Emissions Control/Exhaust Gas Recirculation/TUBE, Exhaust Gas Recirculation (EGR) - Installation .
- Connect the Manifold Absolute Pressure (MAP) sensor harness connector.
- Install the inlet hose and connect the IAT sensor harness connector.
- Connect the negative battery cable and tighten nut to 5 N.m (45 in. lbs.).