Home >> Chrysler >> 2006 >> PT Cruiser Base, 2D Convertible, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 62 (40TE Automatic Transmission (Service Information)) >> 40TE Automatic Transaxle >> Solenoid/Pressure Switch ASSY >> Operation >> Solenoid/Pressure Switch Assembly >> Solenoids

Solenoid/Pressure Switch Assembly: Solenoids

WARNING: This page is about a different car, the 2007 Chrysler PT Cruiser. However, it is still accessible from the selected car via links, so may be relevant.

The solenoids receive electrical power from the Transmission Control Relay through a single wire. The PCM/TCM energizes or operates the solenoids individually by grounding the return wire of the solenoid needed. When a solenoid is energized, the solenoid valve shifts, and a fluid passage is opened or closed (vented or applied), depending on its default operating state. The result is an apply or release of a frictional element.

The 2/4 and UD solenoids are normally applied, which by design allow fluid to pass through in their relaxed or "off" state. This allows transaxle limp-in (P,R,N,2) in the event of an electrical failure.

The continuity of the solenoids and circuits are periodically tested. Each solenoid is turned on or off depending on its current state. An inductive spike should be detected by the PCM/TCM during this test. It no spike is detected, the circuit is tested again to verify the failure. In addition to the periodic testing, the solenoid circuits are tested if a speed ratio or pressure switch error occurs.