LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2006 >> PT Cruiser Base, 2D Convertible, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 59 (2.4L Engine (Service Information)) >> Valve Timing >> Carrier-Balance Shafts >> Removal >> Balance Shafts And Carrier Assembly >> Balance Shaft Carrier

Balance Shaft Carrier

WARNING: This page is about a different car, the 2007 Chrysler PT Cruiser. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Gear Cover & Gears
GC0021293Courtesy of CHRYSLER LLC
1 - STUD (DOUBLE ENDED)
2 - DRIVE GEAR
3 - DRIVEN GEAR
4 - CARRIER DOWEL
5 - GEAR(S)
6 - GEAR COVER

The following components will remain intact during carrier removal: Gear cover (6), gears (5), balance shafts and the rear cover. See Fig 1.

  1. Drain engine oil.
  2. Remove the oil pan and pick-up tube. Refer to REMOVAL .
    Fig 2: Chain Cover, Guide & Tensioner
    GC0021295Courtesy of CHRYSLER LLC
    1 - STUD
    2 - TENSIONER (ADJUSTER)
    3 - GEAR COVER
    4 - ADJUSTER SCREW
    5 - SHOULDERED PIVOT SCREW
    6 - CHAIN COVER (CUTAWAY)
    7 - GUIDE
  3. Remove chain cover (6), guide (7), and tensioner (2). See Fig 2.
    Fig 3: Drive Chain & Sprockets
    GC0021292Courtesy of CHRYSLER LLC
    1 - NICKEL PLATED LINK AND MARK
    2 - GEAR/SPROCKET SCREWS
    3 - NICKEL PLATED LINK AND DOT
  4. Remove screw retaining balance shaft drive sprocket (2). See Figure.
  5. Move balance shaft inboard through drive chain sprocket. Sprocket will hang in lower chain loop.
  6. Remove carrier to crankcase attaching bolts to remove carrier.