LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2006 >> PT Cruiser Base, 2D Convertible, Standard >> Repair and Diagnosis >> Engine Performance >> Testing & Diagnosis >> 2.4L Engine - DTCS P0016 To P0125, Diagnostic Code Index, Pre-Diagnostic Troubleshooting Procedure & Intermittent Condition >> Diagnosis And Testing >> P0108-Manifold Absolute Pressure Sensor Circuit High >> Diagnostic Test

Diagnostic Test

  1. 1)  MAP SENSOR VOLTAGE ABOVE 4.92 VOLTS 

    Start the engine.

    With a scan tool, read the MAP Sensor voltage.

    Is the voltage above 4.92 volts? 

    Yes 

    1. Go To  2).

    No 

    1. Refer to the INTERMITTENT CONDITION  Diagnostic Procedure.
    2. Perform (NGC) POWERTRAIN VERIFICATION TEST. (Refer to STANDARD PROCEDURE - NGC POWERTRAIN VERIFICATION TEST VER - 1) .
  2. 2)  MAP SENSOR 
    Fig 1: CHECKING MAP SENSOR
    GC0041545Courtesy of DAIMLERCHRYSLER CORP.

    Turn the ignition off.

    Disconnect the MAP Sensor harness connector.

    Connect a jumper wire between the (K1) MAP Signal circuit and the (K900) Sensor ground circuit in the Sensor harness connector.

    Ignition on, engine not running.

    With a scan tool, monitor the MAP Sensor voltage.

    Is the voltage below 1.0 volt with the jumper wire installed? 

    Yes 

    1. Replace the MAP Sensor.
    2. Perform the POWERTRAIN VERIFICATION TEST. (Refer to ENGINE - STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .

    No 

    1. Go To  3).
      NOTE: Remove the jumper wire before continuing.
  3. 3)  (K1) MAP SIGNAL CIRCUIT SHORTED TO BATTERY VOLTAGE 
    Fig 2: MEASURING VOLTAGE AT THE MAP SIGNAL CIRCUIT
    GC0041559Courtesy of DAIMLERCHRYSLER CORP.

    Turn the ignition off.

    Disconnect the PCM harness connectors.

    Ignition on, engine not running.

    Measure the voltage on the (K1) MAP Signal circuit in the MAP Sensor harness connector.

    Is the voltage above 5.2 volts? 

    Yes 

    1. Repair the short to battery voltage in the (K1) MAP Signal circuit.
    2. Perform the POWERTRAIN VERIFICATION TEST. (Refer to ENGINE - STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .

    No 

    1. Go To  4).
  4. 4)  (K1) MAP SIGNAL CIRCUIT OPEN 
    Fig 3: MEASURING RESISTANCE OF THE MAP SIGNAL CIRCUIT
    GC0041546Courtesy of DAIMLERCHRYSLER CORP.

    Turn the ignition off.

    CAUTION: Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install Miller Special Tool #8815 to perform diagnosis.

    Measure the resistance of the (K1) MAP Signal circuit from the MAP Sensor harness connector to the appropriate terminal of special tool #8815.

    Is the resistance below 5.0 ohms? 

    Yes 

    1. Go To  5).

    No 

    1. Repair the open in the (K1) MAP Signal circuit.
    2. Perform the POWERTRAIN VERIFICATION TEST. (Refer to ENGINE - STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .
  5. 5)  (K1) MAP SIGNAL CIRCUIT SHORTED TO THE (F855) 5-VOLT SUPPLY CIRCUIT 
    Fig 4: MEASURING RESISTANCE BETWEEN THE MAP SIGNAL CIRCUIT AND 5-VOLT SUPPLY CIRCUIT
    GC0041560Courtesy of DAIMLERCHRYSLER CORP.

    Disconnect the C2 PCM Harness connector.

    Measure the resistance between the (K1) MAP Signal circuit and the (F855) 5-volt Supply circuit in the MAP Sensor harness connector.

    Is the resistance below 100 ohms? 

    Yes 

    1. Repair the short between the (F855) 5-volt Supply circuit and the (K1) MAP Signal circuit.
    2. Perform the POWERTRAIN VERIFICATION TEST. (Refer to ENGINE - STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .

    No 

    1. Go To  6).
  6. 6)  (K900) SENSOR GROUND CIRCUIT OPEN  
    Fig 5: MEASURING RESISTANCE OF THE SENSOR GROUND CIRCUIT
    GC0041548Courtesy of DAIMLERCHRYSLER CORP.

    Measure the resistance of the (K900) Sensor ground circuit from the MAP Sensor harness connector to the appropriate terminal of special tool #8815.

    Is the resistance below 5.0 ohms? 

    Yes 

    1. Go To  7).

    No 

    1. Repair the open in the (K900) Sensor ground circuit.
    2. Perform the POWERTRAIN VERIFICATION TEST. (Refer to ENGINE - STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .
  7. 7)  PCM 
    NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.

    Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.

    Were there any problems found? 

    Yes 

    1. Repair as necessary.
    2. Perform the POWERTRAIN VERIFICATION TEST. (Refer to ENGINE - STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .

    No 

    1. Replace and program the Powertrain Control Module per Service Information. Refer to MODULE-POWERTRAIN CONTROL and STANDARD PROCEDURE - PCM/ECM/SKREEM PROGRAMMING .
    2. Perform the POWERTRAIN VERIFICATION TEST. (Refer to ENGINE - STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .