LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2006 >> PT Cruiser Base, 2D Convertible, Standard >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 2.4L DOHC Engine >> Cover(S)-Timing Belt >> Removal >> Front Cover-Upper

Front Cover-Upper

Fig 1: RIGHT MOUNT
GC0042900Courtesy of DAIMLERCHRYSLER CORP.
1 - ENGINE MOUNT THROUGH BOLT
2 - RIGHT FENDER
3 - UPPER TORQUE STRUT BRACKET
4 - UPPER TORQUE STRUT
5 - LOWER TORQUE STRUT BRACKET
6 - LOWER TORQUE STRUT
7 - RIGHT ENGINE MOUNT
  1. Remove upper torque strut (4) attaching bolts and set strut aside (Refer to ENGINE/ENGINE MOUNTING/TORQUE STRUT - REMOVAL)  .
    Fig 2: A/C LINES
    GC0042901Courtesy of DAIMLERCHRYSLER CORP.
  2. Turbocharger equipped vehicles: 
    1. Discharge and evacuate air conditioning system, (Refer to the appropriate procedures under PLUMBING - STANDARD PROCEDURE ).
    2. Disconnect air conditioning lines at junction block (1) near upper timing belt cover.
    Fig 3: Front Timing Belt Covers
    GC0021281Courtesy of DAIMLERCHRYSLER CORP.
    1 - UPPER COVER FASTENERS
    2 - LOWER COVER FASTENERS
  3. Remove upper timing belt cover fasteners (1) and remove cover. See Fig 3.