LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2006 >> PT Cruiser Base, 2D Convertible, Standard >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 2.4L DOHC Engine >> Cover(S)-Timing Belt >> Installation >> Front Cover - Upper

Front Cover - Upper

Fig 1: Front Timing Belt Covers
GC0042910Courtesy of DAIMLERCHRYSLER CORP.
1 - UPPER COVER FASTENERS
2 - LOWER COVER FASTENERS
  1. Install timing belt cover and tighten fasteners (1) to 6 N.m (50 in. lbs.). See Fig 1.
    Fig 2: RIGHT MOUNT
    GC0042913Courtesy of DAIMLERCHRYSLER CORP.
    1 - ENGINE MOUNT THROUGH BOLT
    2 - RIGHT FENDER
    3 - UPPER TORQUE STRUT BRACKET
    4 - UPPER TORQUE STRUT
    5 - LOWER TORQUE STRUT BRACKET
    6 - LOWER TORQUE STRUT
    7 - RIGHT ENGINE MOUNT
  2. Install upper torque strut (4) (Refer to ENGINE/ENGINE MOUNTING/TORQUE STRUT - INSTALLATION)  .
    Fig 3: A/C LINES
    GC0042914Courtesy of DAIMLERCHRYSLER CORP.
  3. Turbocharger equipped vehicles: 
    1. Connect air conditioning lines at junction block (1) near upper timing belt cover.
    2. Recharge air conditioning system (Refer to the appropriate procedures under PLUMBING - STANDARD PROCEDURE ).
  4. Perform torque strut adjustment procedure (Refer to ENGINE/ENGINE MOUNTING/TORQUE STRUT - ADJUSTMENTS)  .