Interior & Exterior (1 Of 2): DECKLID/Hatch/Liftgate/Tailgate: Striker: Installation
Courtesy of DAIMLERCHRYSLER CORP.
- Position the decklid striker (1) onto the decklid opening lower panel (3) and align the striker to the previously marked location.
- Install the two retaining screws (1) that secure the striker to the lower panel. Tighten the screws to 28 N.m (21 ft. lbs.).
- Verify decklid alignment and operation. The decklid should fit flush and have even gaps to adjacent body panels. Gap specifications are as follows:
- 7 mm (0.280 in.) to the fascia.
- 6 mm (0.240 in.) to the decklid header.
- 4 mm (0.160 in.) to the body side.