LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2006 >> PT Cruiser Base, 2D Convertible, Standard >> Repair and Diagnosis >> Accessories & Equipment >> Headlights >> Lighting Systems - Exterior (Service Information) >> Multi-Function Switch >> Installation

Multi-Function Switch: Installation

  1. Position the left multi-function switch in the slot in the back of the Steering Column Control Module (SCCM) (1) and connect the switch connector (3).
  2. Connect the instrument panel wiring harness connector to the back of the left multi-function switch.
  3. Align switch with the SCCM (2) and slide toward steering column.
  4. Install the screw (2) that secures the switch (3) to the SCCM (1).
  5. Install the upper and lower shrouds onto the steering column.
  6. Connect the battery negative cable.