LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2001 >> Sebring LX, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 51 (2.4L Engine (Service Information) - Coupe) >> Piston And Connecting Rod >> Removal And Installation >> Installation Service Points >> >> E << Piston And Connecting Rod Installation

>> E << Piston And Connecting Rod Installation

WARNING: This page is about a different car, the 2005 Dodge Stratus and 2005 Chrysler Sebring. However, it is still accessible from the selected car via links, so may be relevant.
  1. Apply engine oil on the circumference of the piston, piston rings, and oil ring.
  2. Arrange the piston ring and oil ring gaps (side rail and spacer) as shown in the illustration.
  3. Rotate the crankshaft so that crank pin is on the center of the cylinder bore.
    Fig 1: Applying Engine Oil On Circumference Of Piston
    G04538290Courtesy of DAIMLERCHRYSLER CORPORATION
  4. Use suitable thread protectors on the connecting rod bolts before inserting the piston and connecting rod assembly into the cylinder block.

    Care must be taken not to nick the crank pin.

  5. Insert the piston and connecting rod assembly into the cylinder with front mark on the piston crown pointing to the timing belt side.
  6. Using a suitable piston ring compressor tool, install the piston and connecting rod assembly into the cylinder block.
    Fig 2: Inserting Piston And Connecting Rod Assembly Into Cylinder
    G04538291Courtesy of DAIMLERCHRYSLER CORPORATION