LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2001 >> Sebring LX, 2D Convertible >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 2.7L V6 Engine - VIN U >> Engine Mounting >> Right Mount >> Removal & Installation >> Installation

Removal & Installation: Installation

  1. Position right engine mount and install frame rail to mount bolts. Tighten bolts to 61 N.m (45 ft. lbs).
  2. Install the mount to engine support bracket bolts and tighten to 61 N.m (45 ft. lbs).
  3. Raise vehicle on a hoist.
  4. Install heater tube rear attaching screw.
  5. Install inner splash shield and lower vehicle.
  6. Install heater tube front attaching screw.
  7. Install coolant bottle.