Installation - 2.7L
- Clean all sealing surfaces.
- Install water pump and gasket. Tighten mounting bolts to 12 N.m (105 in. lbs.).
- Install timing chain guides, timing chain, and timing chain cover (Refer to appropriate ENGINE article.)
- Reconnect negative battery cable.
- Fill cooling system (Refer to COOLING SYSTEM - FILLING ).