LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 1989 >> Conquest Standard >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 2.6L 4-CYL - VIN [E] & 2.6L 4-CYL Turbo - VIN [N]] >> Removal & Installation >> Engine >> Installation

Removal & Installation: Engine: Installation

  1. To install engine/transmission assembly, reverse removal procedure. Use care to align front engine mount locating holes without twisting rubber on insulator. Tighten insulator mounting bolts and nuts with full weight of engine/transmission on insulators. Reconnect electrical connector near fuel pump and replace panel in luggage compartment.
  2. Replace all gaskets and "O" rings. Replace all fluids and fill to specified capacity. Recharge A/C system if discharged. Adjust all belts, control cables and linkage. Ensure engine gauges, brake system, transmission gearshift linkage, steering, and clutch operate properly BEFORE road testing vehicle.
NOTE: Where necessary, see appropriate CLUTCHES or TRANSMISSION SERVICING article in this section when removing engine or engine/transmission assemblies.


  1. To install engine or engine/transmission assembly, reverse removal procedure. Use care to align insulator locating holes without twisting rubber on insulators. Tighten insulator bolts and nuts with full weight of engine or engine/transmission on insulators.
  2. Replace all gaskets and "O" rings. Replace all fluids and oil, filling each to specified capacity. Recharge A/C system if discharged. Adjust all belts, control cables and linkage. Ensure engine gauges, brake system, transmission gearshift linkage, steering, and clutch operate properly BEFORE road testing vehicle.